Page 29 - Unanet GovCon: Setting Up Contracts and Projects
P. 29

Pay Codes

                                               Project Default Pay Code is CODE.






               Setting Up Projects to Support the Triple Constraints


               Billing Type is an optional setting assigned at the Project level on the Accounting tab for
               all projects. Tasks can also be assigned billing types once the project-level billing type
               has been selected. If no project billing type has been selected, no billing type can be
               assigned to tasks on that project. Task-level billing types can differ from the Project-
               level billing type, and tasks on the same project can have different billing types from
               each other. This field is available as selection criteria on several Project Accounting
               reports, ad-hoc reports, and export templates. Once charges have been posted to a
               project or task, the billing type cannot be changed.

               Billing Types for Projects and Tasks

               Unanet offers four different billing types:


                   •  Time and Materials (TM): Labor values for revenue and cost are determined by
                       multiplying hours by an applicable rate, while expense values for revenue and
                       cost are determined by the direct cost of the expense multiplied by a fixed
                       markup percentage

                   •  Fixed Price (FP): Calculates revenue for a task or project based on the billing
                       schedule configured for the project

                   •  Cost Plus (CP): Calculates revenue and costs associated with a project based
                       on the direct cost plus any set of indirect costs mapped in the cost structures plus
                       any fee calculations configured on the project’s Accounting tab

                   •  Non-billable (NB): Projects that capture time and expenses that will not be billed
                       to a customer or another department












               LESSON 2: CONFIGURING PROJECTS AND TASKS
                                                                                  ©2022 Unanet. All rights reserved.   29