Page 53 - Unanet GovCon Using Billing Revenue - Participant Guide ebook
P. 53

8.  For the Billing Type TM (Time & Materials), at what STEP of the billing
                              process is revenue recognized?
                              a)  Billing & Revenue Post
                              b)  Generate a draft invoice
                              c)  Complete Invoice

                          9.  For the Billing Type CP (Cost Plus), at what STEP of the billing process is
                              revenue recognized?
                              a)  Billing & Revenue Post
                              b)  Generate a draft invoice
                              c)  Complete Invoice

                          10. For the Billing Type FP (Fixed Price), with a revenue recognition method
                              of When Billed, at what STEP of the billing process is revenue
                              recognized?
                              a)  Billing & Revenue Post
                              b)  Generate a draft invoice
                              c)  Complete Invoice

                          11. Indirect Costs are calculated based on the Indirect Cost Formula and
                              Indirect Rates in the Cost Structure. The System Admin Posting Option
                              Setup defines which Indirect Rate (Actual, Provisional, or Target) is to be
                              used to calculate the Billing & Revenue Recognition amounts for which
                              type of contract?
                              a)  Fixed Price (FP)
                              b)  Cost Plus (CP)
                              c)  Time & Materials (TM)

                          12. Cost Plus type contracts are typically billed at the Provisional rates, which
                              is the estimated rate submitted to an external agency such as Defense
                              Contract Management Agency (DCMA). What is the reason why this may
                              result in a difference between Billings and Revenue at the end of the
                              year?
                              a)  Due to the different indirect rates used, as define by the System Admin
                                 Posting Option Setup, between the Provisional rates for Billings and
                                 Actual rates used to calculate Revenue Recognition amounts
                              b)  Due to the same indirect rate used for Billings and Revenue
                                 Recognition amounts as define by the System Admin Posting Option
                              c)  Due to the Bill date on the billing schedule









               LESSON 4 REVENUE RECOGNITION
                                                                                  ©2022 Unanet. All rights reserved.   53
   48   49   50   51   52   53   54   55   56   57   58