ACCOUNTING
*Advanced Costing
Enables Advanced Costing for the project
*Default Labor Cost Element for Advanced Costing
Establishes the cost element that will be used for labor when a Person’s default labor
cost element is not valid for the project’s cost structure; required when Advanced
Costing is enabled
MANAGE ADVANCED COSTING RATES
Fiscal Year
All fiscal years configured in Admin Setup
Indirect Cost
All Indirect Costs for the selected Cost Structure
Rate Type
Provisional: Rate determined by forward pricing, typically used for billing
Target: Goal rate determined based on budgets, typically used for long-term planning
Indirect Cost Rate
Positive number from 0 – 999.999999999999
Once the fields for the Advanced Costing rates have been completed and saved, each
entry will be automatically annotated with the username that created the entry and the
date.
Activity 2.6 – Create a New Cost Plus Project
Login: Dana Contracts (Project Manager) – dcontracts / welcome
Activity Steps:
Part 1: Copy and modify an existing Project
1. On the left side of the Home dashboard, navigate to My Lists and select “Project
Execution Course Projects”.
2. Select the copy icon beside the project “253CONSULT PM3-ANALYSIS-CP”.
3. Check the box to “Select All” project attributes.
4. Uncheck the boxes for “Fixed Price” and “Self Assign”.
5. Press Next.
6. Modify the project profile as indicated below, pressing Save on each screen to
ensure changes are preserved.
PROFILE
*Owning Organization: GS-CYBER - Cyber
*Project Organization: 253CONSULT – Two Five Three Consulting
Contract: SCA-24 – Security Services
*Project Code: TRAINING-CP-EXPENSES
Project Title: Two Five Three Consulting Training Expenses
LESSON 2: CONFIGURING PROJECTS AND TASKS