PM Type Labor (Grid)
                   •   Path - Project Path
                   •   Name - Project Name
                   •   CAP - Labor cap to be applied. Depending on the setup of the invoice design, the
                       labor cap can prevent the project from billing labor over this amount (aka hard
                       cap).
                   •   Fixed Fee - Fixed fee amount. This amount is used in both percent complete and
                       lump sum billing. In both cases, the total contract amount for the node should be
                       put here.
                   •   % Complete - This is the percent complete of the node. This can also be set from
                       Project Accountant Bill Review.
                   •   Lump Sum - This is the lump sum portion of the fixed fee that is to be billed until
                       it reached the fixed fee amount. It is also accessible in the PA/PM Bill Review
                       screens. In order to use this feature, you must use an invoice design whose labor
                       section has been designated to use this field. Two new invoice formats that
                       support lump sum billing have been added. Lump Sum Level 1 works at the
                       project level while Lump Sum Level 2 works at the phase level (2nd level).
                   •   ICC FF Portion - Dollar amount of fixed fee that should be attributed to ICC for
                       the entire WBS node.
                   •   ICC Current FF - Dollar amount of fixed fee that should be applied to ICC on next
                       invoice.
                   •   % of Fee - Looks at the Total Fee located in the Percent of Construction box and
                       uses the % to come up with the Fixed Fee amount for that node.
                   •   Fixed Fee Notes - General notes about the node can be stored here. These are
                       accessible in PA & PM Bill Review.

               PM Type Non-Labor (Grid)
                   •   Path - Project Path
                   •   Name - Project Name
                   •   CAP - ODC or OCC Cap to be applied. Depending on the setup of the invoice
                       design, the cap can prevent the project from billing non-labor transactions over
                       this amount (aka hard cap).


               Default Bill Status
               This allows you to set the default bill status for transactions that go against this project.
               These features do not limit the statuses; they simply specify the default value on a new
               transaction.


               Expense Markups/Codes
               Expense multipliers and expense overrides on a per-project basis are established here.
               Project Override Expense for ODC (Other Direct Charges) and CNS (Consultant
               Expense), can be set at any level of the WBS (Work Breakdown Structure). Setting the



               Lesson 2: Project Explorer                                   ©2023 Unanet. All rights reserved.  22