Page 15 - Unanet GovCon: Setting Up Contracts and Projects
P. 15

LESSON 2: CONFIGURING PROJECTS AND TASKS




               Learning Objectives
                   •  Review Unanet’s recommended system configuration to support Contract
                       management and the Project life cycle
                   •  Create Projects with and without Tasks to manage different billing types


               Introduction

               Projects, combined with Organizations, are the organizing feature for performing work in
               Unanet. Projects are used to charge time and expenses, plan and assign resources to
               efforts, and filter criteria on reports. Based on the types of work efforts fulfilled by your
               company, you may create a Project with Tasks, multiple Projects, or multiple Projects
               with Tasks. Project management needs can vary widely between companies, but there
               are some configuration settings that Unanet recommends to all users to increase
               efficiency in business processes and provide greater visibility into costs and revenue.


               System Configuration for Project Management

               The Administrator can access the Properties and Setup screens located in the Admin
               menu to establish project management options for the entire system. The settings
               configured at this level can be modified as needed to support new contract
               requirements.

                                                          ADMIN
                                PROPERTIES                                      SETUP
                   Project Code Source                       Note Statuses
                   Determines the value that will be used as a   Customizable list of status options that can be
                   prefix and the source of project code     assigned to project notes as a filtering option on
                   sequence numbers automatically generated   searches and reports
                   by the system

                   Project Code Separator                    Note Types
                   Enables the selection of a standard       Contains the list of descriptive labels and text that
                   separating character between the prefix and   define the types of project notes in use; can be
                   sequential number of an automatically     assigned to project notes as a filtering option on
                   generated project code                    searches and reports


                   Project Code Sequence Number              Project Statuses
                   Minimum Length
                   Establishes the minimum length of any     A search criterion in reports that can be used to
                   automatically generated project codes     designate whether a project is active or inactive;
                                                             only active projects will appear available on
                                                             timesheets and expense reports; additional status
                                                             options can be created by a user with the
                                                             Administrator role



               LESSON 2: CONFIGURING PROJECTS AND TASKS
                                                                                  ©2022 Unanet. All rights reserved.   15
   10   11   12   13   14   15   16   17   18   19   20