Page 16 - Unanet GovCon: Setting Up Contracts and Projects
P. 16

Default new Assignments to be Linked to  Project Types
                   Project/Task Dates
                   Controls whether the “Link Dates to       Can be assigned at the Project or Task level and
                   Project/Task Dates” option is enabled by   are applied in conjunction with cost accounts (by
                   default when a new assignment is added to a  expense type) and posting group accounts (for
                   project                                   example, labor); checking the “Administrative” box
                                                             on a Project Type does not impact how a project
                                                             is configured or managed but can be used as a
                                                             reference in ad hoc reports and exports

                   Default new Plans to be Linked to         User Defined Fields: Project
                   Project/Task Dates                                                          Project Note
                   Controls whether the “Link Dates to       Provides up to twenty optional fields that may be
                   Project/Task Dates” option is enabled by   formatted as text, numbers, dates, URLs, or pick
                   default when a new plan is added to a     lists; may be visible to or hidden from end users
                   project

                   Allow Self Assign to be set to default
                   Establishes whether new projects added to
                   the system will automatically allow or prevent
                   users from assigning themselves to projects

                   Advanced Costing
                   Enables advanced costing features to apply
                   variable Target and/or Provisional indirect
                   rates to individual projects and/or tasks

                   Allow Bill Rate Edit
                   Controls the ability of non-administrative
                   users with the Bill Rate Manager role to edit
                   bill-related rate fields

                   Allow Cost Rate Edit
                   Controls the ability of non-administrative
                   users with the Cost Rate Manager role to
                   edit cost-related rate fields




                          Demo 2.1 – Review Administrative Project Settings
                          Understanding the global settings that apply to project management in
                          Unanet will enable you to better leverage the functionality to streamline your
                          processes. The tables below highlight the system areas of which you should
                          be aware.

               Demo Steps
                   1.  Review settings related to project management located in Properties within the
                       Admin menu.
                   2.  Review the configuration options in the Project table of Admin Setup and discuss
                       use cases for each.




               LESSON 2: CONFIGURING PROJECTS AND TASKS
                                                                                  ©2022 Unanet. All rights reserved.   16
   11   12   13   14   15   16   17   18   19   20   21