Page 36 - Participant Guide - Unanet GovCon Analyzing Project Metrics
P. 36
Activity 4.4 – Analyze Profitability Metric on Plans
Use the table below to compare the profit planned on the projects against the Profitability
KPI Metric Threshold provided by MYCO management.
Stay logged in as Gus Lead. userid: glead password: welcome
Project to be reviewed for Profitability Metric
Planned Profitability Threshold
APF- ANALYZING -CP N/A (CP project)
APF- ANALYZING -FP Plan at 25% ± 2%
APF-ANALYZING-TM Plan to 25% ± 5%
Activity Steps
1. Run the Cost Summary and Status Report created in Activity 4.2
- Reports > Saved > Use in Activity 4.4 Profitability Metric on Plans
2. Based on this report, write in the results for planned profit % for the APF-
ANALYZING projects and decide if the plans can be validated based on
Profitability.
Planned Are Results
Project
Profit % within threshold?
Y or N
APF- ANALYZING -FP
APF-ANALYZING-TM
Check your understanding
Common metrics for validating a plan include plans that meet which of these
metrics?
a) Plans within the period of performance
b) Plans that comply with the contract
c) Plans that are technically executable
d) Plans that are within the revenue thresholds
e) Plans that are within the profitability thresholds
f) All the above
Refer to Appendix A for answers to the Check Your Understanding questions
Lesson 4: Validating Project Plans
©2020 Unanet. All rights reserved. 35