Page 42 - Participant Guide - Unanet GovCon Analyzing Project Metrics
P. 42
1) A Senior Design Engineer is needed to replace the current Design
Engineer
2) The system engineer helped resolve the design issues; however,
had to work more hours than assigned. He also needs another 20
hours to complete his effort on this project.
2. Using PM insight and the information above, write in your assumptions for the
profit and revenue metrics on each project. You can use terms such as higher
than budgeted, lower than budgeted, or not applicable.
Project Expected Expected
Revenue Profitability
APF-FORECAST-CP
APF-FORECAST-FP
APF-FORECAST-TM
Demo 5.2 – Configure Key Reports to Analyze Metrics on Forecast
Instructor is logged in as Gus Lead. His relevant role is Project Lead and the system
setting to allow non-cost rate managers access to Project Cost Reports
Demo Highlights:
Step through the criteria for the two primary reports used for the revenue and
profitability metrics based on the forecasted values.
• Part 1 Review criteria for Revenue Funding Summary Report
o Use Saved Report: APF-Demo 5.2 Revenue on Forecast
• Part 2 Review criteria for Cost Summary and Status Report
o Use Saved Report: APF-Demo 5.2 Profitability on Forecast
Lesson 5: Monitoring Project Performance
©2020 Unanet. All rights reserved. 41