Page 79 - Unanet AE: Using Project Management
P. 79

10. Verify that the Transaction Date radio button in the Date Range Evaluation
                       Methods Labor section is selected.
                   11. Verify that the Transaction Date radio button in the Date Range Evaluation
                       Methods Non-Labor section is selected.
                   12. Select the Print button. The report displays. Projects are displayed one per page.
                   13. Expand Schedule Analysis (Bill Rate) in the menu on the left side of the report.
                   14. Select the <fifth project> listed. The project page displays.





































































                                                                            ©2024 Unanet. All rights reserved.  79
   74   75   76   77   78   79   80   81   82   83   84