Page 33 - Unanet GovCon: Using Analytics Studio for Project Management Reporting
P. 33

Activity 3.2 – Create a Periodic JSR Bar and Line Chart
                          In this activity, you will use the report you created in Activity 3.1 and add a bar
                          and line chart.
                          Note: To avoid errors with formulas, be sure to type the formulas rather than
                          using copy and paste.


               Activity Steps

               Part 1: Duplicate a Report
                   1. Select the right-facing arrow for My Reports.
                   2. Select Periodic JSR Data.
                   3. Select the Menu button > Duplicate. The Duplicate Report window opens.
                   4. Type Periodic Bar & Line Chart in the Enter the report name field.
                   5. Select My Reports.
                   6. Select the Okay button.
                   7. Select Periodic Bar & Line Chart.
                   8. Select the Menu button > Edit.
                   9. Select Header: PRJ: Periodic JSR.Project Code > Delete Section.
                   10. Select Header: PRJ: Periodic JSR.Task Number > Delete Section.
                   11. Select Footer: PRJ: Periodic JSR.Product Code > Delete Section.


               Part 2: Update Report Sorts
                   1. Select Report Options > Sorts. The Report Sorts window opens.
                   2. Select the Delete button for the PRJ:Periodic JSR.Project Code sort.
                   3. Select the Delete button for the PRJ:Periodic JSR.Task Number sort.
                   4. Select PRJ: Periodic JSR in the dropdown list.
                   5. Drag Period End Date to the Sort By pane.
                   6. Select the Okay button.


               Part 2: Add a Report Header Section
                   1. Select Page Header > Add Section > Report Header.
                   2. Select column G > Insert Columns After.
                   3. Select column G > Insert Columns After.
                   4. Use the information in the table to add labels to the report:
                        Cell        Value
                        C19         Period End Date

                        D19         Periodic Revenue
                        E19         Periodic Raw Cost
                        F19         Periodic Total Cost
                        G19         Cumulative Revenue
                        H19         Cumulative Raw Cost





               LESSON 3: ADVANCED REPORTING
                                                                                  ©2022 Unanet. All rights reserved.   33
   28   29   30   31   32   33   34   35   36   37   38