Page 52 - Unanet AE: Using Project Management
P. 52
o Legend
Legend - Color-coded legend used to show the user if the schedule
is properly structured (i.e., balanced, over-scheduled, etc.).
Activity 2.2 – Use the Resource Scheduler
In this activity, you will use the resource scheduler.
Activity Steps
Desktop
1. Navigate to Project Management > Resource Scheduler. The Resource
Scheduler applet opens.
2. Select the Filters tab at the bottom of the screen.
3. Select the <date used in activity 1.11, part 2, step 11> in the Start field.
4. Select the Load Schedules button.
5. Select the Projects tab.
6. Select the <first date cell with hours scheduled> for New Building.
7. Select the Work Breakdown tab at the bottom of the screen.
8. Select Enter New Line.
9. Select the down arrow in the cell.
10. Select PN0005-001-002. This is the second item on the drop-down list.
11. Select the Lookup icon in the Employee Code field. The Rate Schedule
Employees window opens.
12. Double-click Stanwyk, Gail W.
13. Type 8 in the Hours field.
14. Select the Save button.
15. Select the Employees tab.
16. Select the cell in the first date column for Fletcher, Erwin P.
17. Select the Work Breakdown tab at the bottom of the screen.
18. Type 8 in the Hours field.
19. Select the Lookup icon in the Project field. The Projects window opens.
20. Type New Building.
21. Select the Search button.
22. Double-click 003-001 Design Development.
23. Select the Lookup icon in the Job Title Code field. The Job Titles window
opens.
24. Double-click CAD01.
25. Select the Save button.
©2024 Unanet. All rights reserved. 52